Copyright Wudi Zhibo Metals Co., LTD
Contact us
Tel:+86-0543-6288039/+86-0543-5076388
Fax:+86-0543-5076399
E-Mail:zhibometal@zbhardware.com
© ALL COPYRIGHT
Copyright Wudi Zhibo Metals Co., LTD
Powered by www.300.cn
swing hangers kits 850KG stainless steel 304
swing hangers kits 850KG stainless steel 304
1. When we receive the goods, we must first check the instructions to see if the various accessories and materials are complete, and whether there are any missing accessories. If there is a need to promptly report the accessories to the store and then install them, so as not to cause inconvenience to the installation. . Some businesses also pack the tension spring into the bottom frame tube of the hanging chair, so be careful when checking them.
2. After that, we have to classify all kinds of parts, so that we can easily take the materials during installation. The first thing to do is to loosen the screws and nuts on the bottom frame of the lift chair.
3. Next, we need to take out the tension spring hanging on the screw. Be extra careful in this step to avoid hurting your hands.
4. Then we need to put the bracket into the bottom bracket tube, align the bracket to the hole and insert the screw.
email:sales003@zbhardware.com